By Martin Nichols
This is the first part of a detailed history of 80064, from her construction at Brighton Works to the present day. Further parts will follow.
Part 1: Background and construction
80064 was built at Brighton works and completed in June 1953. It might be of interest to describe a little of the history of Brighton works. As railway workshops go it was very early one, having been established in 1840 by the London & Brighton railway although no new locomotives were built there until the 1850s. By the time of the grouping in 1923 it had produced most of the locomotives of what had become the London, Brighton and South Coast Railway (LB&SCR). Because of the confined nature of the site the works could not easily be expanded. Further, as part of the newly formed Southern Railway, Brighton works were somewhat overshadowed by the works of the other constituent companies. The LSWR’s works at Eastleigh, for example, was still relatively new and well equipped. Some new locomotives were still made at Brighton in the years following the grouping. Ten River class 2-6-4Ts, ten ‘U’ class 2-6-0s and all eight of Maunsell’s ‘Z’ class three-cylinder 0-8-0Ts were built there between 1926 and 1929 but it wasn’t until the second war that Brighton works received significant investment and modernisation. By this time Mr Bulleid was the Southern Railway’s chief engineer and the new equipment included arc welding facilities. Good use was made of this technique in the tenders and boilers for his Pacifics. Between 1945 and 1951 the works built over 100 of these locomotives.
As part of the war effort the works produced 93 Stanier designed 8F 2-8-0s. At their peak they were completing a new 8F every 4.5 days!
After the railways were nationalised in 1948 Brighton built a batch of LMS Fairburn 2-6-4Ts. Forty-one of these were built between 1950 and 51 to replace ageing tank locomotives on the Southern Region. Two Brighton built Fairburns, 42073 and 42085 are now preserved on the Lakeside and Haverthwaite railway in Cumbria. The last of the batch was completed in 1951 and by that time the newly established ‘Railway Executive’ of the British Transport Commission had formulated their requirements for new steam locomotives. Originally there were to be eleven new classes but the destruction of 46202 (Princess Anne) in the dreadful crash at Harrow in 1952 gave the opportunity for a Class 8 pacific to be included in the new designs. Detail design work was spread amongst the regional drawing offices. Brighton drawing office took on the designs for three of them: the 9F 2-10-0s, the class 4 2-6-4Ts and the class 4 4-6-0s. Whilst the 2-10-0 and 4-6-0 were built elsewhere 130 of the total of 155 2-6-4Ts were built at Brighton. The first of them, 80010 was completed in July 1951 almost immediately after the last of the Fairburn 2-6-4Ts. The numerically earlier 80000-80009 were built at Derby but the first of these was not completed until September 1952. The last of the BR 2-6-4Ts 80154 was completed in March 1957 and was the very last locomotive built at Brighton.
You can find out more about Brighton Works here:
The design of the BR 2-6-4Ts was closely based on the LMS 2-6-4Ts that preceded them, but variations were required to allow them to work over a larger portion of the newly nationalised rail network. This is most evident from the sleek curved side-tanks which were of welded construction rather than riveted. Less obvious was the use of smaller cylinders and driving wheels with an increase in boiler pressure which gave the BR version a slightly higher tractive effort than the LMS versions. There were only minor changes to the design as the building of these 155 locos progressed. This probably reflects the care taken and scrutiny given during the original design process. One externally visible change was to the coupling rods which were initially fluted but on later locomotives were of plain cross section.
80064 was built as part of a batch of ten locos (80059-68) on works order BR5271 and according to its BR Record Card it was released into traffic on 9 June 1953. At the time it was normal to give new locos a week or so of running from the local depot before sending them off to their allotted shed. Any defects that became apparent during this time could be easily rectified by the works.
Part 2 to follow. Read a shorter overview of 80064’s life on The locomotive page.